Home › Standby generators › Permits and the gas meter
Generac standby generators · Shelby Township, MI

Generator permits and the gas meter

A standby generator needs an electrical permit, and the gas hookup needs a mechanical permit. We pull the permits and schedule the inspections for you. Both permits are included in every Wolverine Generac package.

Need a quick answer?

Hi, I'm Barb. Ask me about permits, inspections and the gas meter, or I can book your free estimate right here.
Barb · Wolverine's AI assistant

From signing to running: what happens

Usually 1 to 2 weeks, depending on the time of year and when the city or township can schedule the inspection.

  1. Free estimateWe walk the property, pick the spot and size the generator. You get a written quote.
  2. Order and permitsYou sign, we order the generator and apply for the permits.
  3. The gas meterIf your gas meter needs an upgrade for the generator, your gas company (DTE, Consumers Energy or whoever serves your home) does it, and it's almost always free. You set that up with the gas company.
  4. Install dayWe set the pad, the generator and the automatic transfer switch, and connect the gas. Your power is off for a short time while the transfer switch goes in.
  5. Inspection and startupThe city or township inspects the work, then we start the generator and test it with you.

What we handle, and what you do

We pull the permits and schedule the inspections. You don't have to deal with the city or township.

We handle all the calls and paperwork. The one thing you set up yourself is a gas meter upgrade, if your gas company says you need one.

Do cities have rules about where a generator can go?

Yes. Some cities set how far a generator must sit from the house and the property line, and some require screening such as trees or an enclosure.

The rules vary from city to city, so the estimator confirms them for your address at the visit. If your city requires a screening permit, its cost is passed on to you and isn't part of the package price. That doesn't come up often.

Do I need a permit for a standby generator in Shelby Township?

Yes. A standby generator needs an electrical permit, and the gas connection needs a mechanical permit. We pull them for you.

Are the permits included in the price?

Yes. Both the electrical and the mechanical permit are included in every Wolverine Generac package, along with the generator, the automatic transfer switch and the installation.

How long does the whole thing take?

Usually 1 to 2 weeks from signing to running, depending on our schedule and when the inspection can be booked.

Does DTE have to come out?

Not unless your electric meter needs an upgrade for the install, which is priced separately. A gas meter upgrade, if you need one, is done by your gas company.

Can I use the generator before the inspection?

No. We start up the generator after the final inspection, to make sure it runs properly and safely.

Is the estimate free, and where do you work?

Yes. Estimates are free, with no trip fee and no minimum.

We serve Shelby Township, Utica, Macomb Township, Sterling Heights, Washington Township, Romeo, Rochester Hills, Rochester and Troy. Call (248) 808-6277.

Want your price? Use the generator cost calculator or call (248) 808-6277.

Rather we call you?

Leave your number and the office calls you back during business hours to set up your free estimate. No trip fee.

Yousif founded Wolverine Electric in Shelby Township in 2015. The company is a Generac certified installer, and he reviews every generator page on this site. About Yousif