When DTE goes dark, your house doesn't.
Nearly 400,000 DTE customers lost power in July 2026, some for five days. A standby generator starts itself in about ten seconds and runs until the grid is back.
Sized to your house, not a brochure.
Whole house or the essentials. Natural gas or propane. We look at your panel and your gas line before we say a number.
An electrician, not a salesman, walks the property and measures the load. Same-day quote in writing.
We pull the township permit, set the pad, and coordinate the gas line so you don't manage three trades.
Transfer switch, startup, and a full outage test with you watching. Then it exercises itself weekly.
How much does a whole-house generator cost installed in Michigan?
At Wolverine Electric a Generac standby generator installed is $10,036 for 10kW, $12,315 for 18kW and $14,965 for 26kW. Each package includes the automatic transfer switch, the electrical permit, and up to 25 feet of gas line and 25 feet of electric line. Longer runs, a sloped spot ($500), a pre-cast concrete pad ($350), or a panel or electric meter upgrade ($1,500 each) add to it, and the calculator works it all in.
See your number in a minute with the generator cost calculator. These are budget prices; the free site visit sets the final price, and the price we quote is the price you pay.
What size generator do I need?
Wolverine installs three sizes: 10kW for the essentials, 18kW for most of the house, and 26kW for the whole house. An essentials-only setup (furnace, fridge, sump pump, a few circuits) is the smallest and least expensive.
We size at the panel, not by square footage alone: air conditioning tonnage, a well pump, an electric range or dryer, an EV charger, and a hot tub each change the answer. The estimate includes the load measurement. More on how we pick the size.
How long does installation take?
Most installs are one day once the generator and the permit are in hand. Lead time before that is set by unit availability and the township's permit turnaround, usually a couple of weeks.
The order is: estimate, deposit and unit order, permit application, pad, install and gas connection, inspection, startup test. You are without power for a short time while the transfer switch goes in.
Do I need a permit to install a generator in Shelby Township?
Yes. A standby generator needs an electrical permit, and the gas connection needs a mechanical permit, in Shelby Township and every neighboring community. We pull both and schedule the inspections.
Every Wolverine job is permitted and inspected. It protects your insurance coverage and it is the law. If a quote from anyone leaves the permit out, ask why. See generator permits and the gas meter.
Natural gas or propane?
Natural gas if the house has it, which most of Macomb County does. Propane where it doesn't, with a tank sized for the outage length you want to cover.
Natural gas runs indefinitely and is cheaper per hour; propane needs a tank and a delivery plan but works anywhere. The gas line to the generator often has to be upsized, which is part of what the estimate checks.
Do you service generators you didn't install?
Yes. Service visits, repairs and outage troubleshooting on standby generators, including units installed by someone else. Wolverine Electric Company is a Generac certified installer.
We recommend service every 6 months: an oil change, new spark plugs, new oil and air filters, and a check of the fluids, the battery and the generator's software. One visit is $350, or $600 a year for 2 visits. See generator maintenance. Skipped service is the most common reason a generator fails to start in the outage it was bought for.
Do you install generators for businesses?
Yes. Commercial standby power for offices, retail, medical and light industrial buildings, including three-phase systems. Wolverine has installed commercial generators up to 1 MW. Commercial bids go straight to the owner, Yousif Mansi.
For a business the question is usually which loads have to stay up (refrigeration, servers, life safety, a production line) and for how long. That drives the size, the fuel, and whether you need a full building transfer or a critical-loads panel. We also handle scheduled service and load testing on commercial units, single site or multiple properties.
Why now?
Because outages in southeast Michigan are getting longer, not shorter. Nearly 400,000 DTE customers lost power in the July 3 to 4, 2026 storms, some for up to five days, and a 2024 state audit found DTE's restoration performance below the Midwest peer average.
Sources: Planet Detroit, July 2026 outage coverage; Michigan Public Service Commission audit of DTE, 2024. Generator demand spikes within days of an outage; lead times stretch with it. The homeowners who book in a quiet week get the install before the next storm.
Generator guides
What a 10kW, 18kW and 26kW each keep running, and how we pick the size for your home.
Generator sizingThe part that switches your house to the generator on its own. It comes with every package.
Transfer switchesWhich permits you need, who pulls them, and how long it takes from signing to running.
Permits and timelineWhat a service visit includes, how often to book one, and what it costs: $350 a visit or $600 a year.
Generator maintenancePick a size and answer a few questions about your home to see your installed price.
Generator cost calculatorHow to tell if it's DTE's problem or your house, and who to call for each.
DTE or an electricianGenerator questions, answered
Will a Generac run my whole house or just some circuits?
Either. A whole-house unit with a service-rated transfer switch powers everything. A smaller unit with a load-managed or critical-circuits panel powers what you choose. We size it to what you want covered.
How much does it cost to run a whole-house generator per day?
On natural gas, a 22 kW unit at half load burns roughly 2 to 3 therms an hour, which at Michigan residential gas rates works out to about $50 to $85 for a full day of continuous running. Propane costs more per hour and depends on your tank pricing.
Do I need a concrete pad?
No. The standard pad that comes with the generator is included, set on a level base. A pre-cast concrete pad is a $350 upgrade, and leveling a sloped spot is $500.
How far from the house does the generator have to be?
Generac requires 18 inches from the house and 5 feet from any window, door or vent opening, and clearance above. Local code and the gas meter location can add to that. We site it during the estimate.
How often does a standby generator need service?
Every 6 months. The unit also self-tests weekly for a few minutes; if you stop hearing that, call us right away. One service visit is $350, or $600 a year for 2 visits.
Can a whole-house generator run on natural gas?
Yes, and that is the standard setup in Macomb County. The gas line to the unit usually needs to be upsized, which is part of the install.
What happens during a long outage?
On natural gas the generator runs as long as the outage lasts, exercising no more effort than a furnace. On a multi-day outage, check the oil once a day; the controller also tells you when service is due.
Do you install the gas line too?
We coordinate the gas line and the mechanical permit as part of the job so you are not managing an electrician and a plumber separately. One price, one schedule.
Do you offer financing?
Ask when you call. Options depend on the unit and the timing of the current Generac programs, and the office will tell you what is available this month.
Are you the Wolverine that sells generators in Wixom?
No. That is Wolverine Power Systems, a distributor. Wolverine Electric Company is an independent licensed electrical contractor in Shelby Township that installs and services generators for homes and businesses.